I sailed the boat with the new rig this past weekend. I fashioned two
mast crutches that go into the mast steps and partners of the former two
cat ketch masts to carry the longer and heavier mast and other spars.
The standing rigging complicates the setup but once the mast is up
things fall into place. One annoying mishap after we rowed away from
the ramp involved the throat halyard accidentally rolling down its block
until its tail end ended at the masttop. A figure-8 knot stopped it
from coming through completely, and it took many, many attempts to snag
it and pull it down with the boat hook. Well that's not going to happen
again, and if it does I'm a worse fool than I think I am.
But once we got under way, oh man! The wind on Lake Erie was very
fickle, picking up and dying down and constantly changing direction, but
with a decent breeze the boat was flying. Having to work the
jibsheets adds a little extra work when coming about but tacking is
easy, gybes are pretty gentle and the boat much more responsive and
fast. All in all a very good experience. There were no other boats
around so I had no opportunities to get photos so you'll have to take my
word for it!
This is the account of an amateur's hand-building a 15-foot open sail- and row-boat, from original design to crafting the traditional rigging and sewing the sails. Always a glutton for punishment, I am building a similar one in Greece. (Για πληροφοριίες στα Ελληνικά, επισκεφτείτε http://tarsanas.blogspot.com)
Saturday, August 2, 2014
Sunday, June 29, 2014
Dry Run

There are a couple of things missing in the first photo. One is reef lines, which I will add before re-launch. The other is the luff toggles (in lieu of mast hoops) of which there are four: they are there but are not fastened, since they bind on the mast and make pulling on the throat halyard to deploying the mainsail difficult. I will have to use a piece of light line tied to the gaff jaws to remedy the situation.


The third photo (bottom left) shows yours truly holding on the the mainsheet (notice the rudder is missing, I didn't think it necessary for this tryout). You can see the 4x purchase tackle made of four separate single blocks: one with becket, two plain and one pivot. All are secured with loops of line. Behind the sail you can see the outline of the topping lift.
Remaining steps include repainting the decking and touching up parts of the hull, and building a couple of crutches for the mast that fit where the cat ketch masts used to. Maybe next weekend I can re-launch. We'll see.
boatbuilder
Saturday, May 17, 2014
Gaff and boom

I also put on a loop of line
(secured with a steel eye strap on the underside of the gaff) where the peak
halyard will be clipped. This method of
securing rigging with loops of line going around the spar, rather than using
fittings simply screwed into it, was repeated throughout: the shrouds and
forestay, the throat halyard block, the mainsheet blocks, the topping lift and
the boom vang.

At the clew there is an outhaul line that runs through the aft end of the boom past a sheave
and is secured with a clam cleat. This plus the topping lift, which clips anto a loop of line, are shown in the second photo.

Tomorrow if all goes well I will put in halyard and sheet cleats and try out the new running rigging.
boatbuilder
New sails and standing rigging
I’ve been quiet for many months. Between travels, lots of work pressure and a
winter that will enter the history books for its horribleness, progress on the
new rig had been slow. Given what the
spring has been like for far too long (last I checked Lake Erie still had some
ice!), there was no real hurry. In a
brief interval between blizzards and polar temperatures (in my unheated garage
epoxy will not cure in very cold weather), I managed to put two coats of epoxy
on the new mast and bowsprit, and shaped and glued/screwed oak pad eyes at the
mast top to anchor the shrouds and forestay.
Then I made the new sails.
The methods of construction are the same as he ones I used for the sails
of the original rig, and include luff and head tape plus reinforcing
multi-layer patches and/or tapes in a total of thirteen places (7 corners and 6
reefing cunninghams). Of course the
sails are different. The mainsail is
about 85 square feet (7.9 m2), and that’s much larger than anything
I have ever made before. It’s a
trapezoid roughly 8 feet (head) by 8 feet (luff) by 11 feet (foot) by 15 feet (leech). It has two rows of reefing points (made with
grommets this time, since buttonhole sewing is really tiresome), and several
grommets along the luff to attach it to the mast with line and dowel
toggles. Curvature was built in with a
dart starting at the tack, and with broadseaming (variable overlaps in the
seams).
The jib is roughly 12.5 feet (luff) by 6.5 feet (foot) by 10.5
feet (leech), which works out to about 35 square feet (3.25 m2). It has one set of reef points and a small
dart starting at the tack. It will be
attached to the forestay with plastic jib hanks. I will show photos when the sails are up.
The next step was to finish the new spars with two coats of
varnish. Then came the standing rigging,
something the original masts did not have—simple but weak, as I found out to my
regret. I first attached anchor plates
to the gunwales, gluing squares of oak just below the rubrails and driving
heavy duty steel screws through to the frames.
Turnbuckles for tightening the standing rigging were added to the anchor
plates. Two steel pad eyes were bolted
through the tip of the bowsprit as well.
Then I ventured into the totally uncharted territory of making the
shrouds and forestay out of Amsteel Blue rope.
To secure them to the mast, hull (shrouds) and bowsprit (forestay) I had
to make eye splice loops; large ones to go around the mast top at the top end,
small ones to go around thimbles at the lower end. There was a line that anchors the bowsprit tip
to the bow as well, and it needed two more eye splices around thimbles. I thought it would be fun to learn a
different way of splicing, the so-called “long bury” type: it involves tapering
the working end of the rope (by unraveling and cutting of half the strands),
then pulling it down the inside of the standing part. The rule of thumb is that the buried tail
needs to be 72 times the diameter of the rope, or 9 inches for 1/8 inch rope. This makes an eye loop as strong as the rope
itself.

The next post will be about the running rigging.
boatbuilder
Subscribe to:
Posts (Atom)