Showing posts with label masts. Show all posts
Showing posts with label masts. Show all posts

Friday, August 2, 2019

Centerboard, rudder and spars

Since the boat is right side up, I had to lift it off the ground by at least 45 cm (18") to fit the CB and put it in place when it was fully finished. I did it with the help of two people and several bricks (first photo). The CB pivots around a 6 mm (1/4 inch) bolt. The rudder needed a pivot bolt of its own so it can be lifted with a line. Gudgeons and pintles attach it to the transom. The tiller I made from pine lumber, and its jaws from two 12 mm pieces of plywood. There is a pivot bolt attaching the tiller to the rudder top, so the tiller can move up and down as needed, especially with the outboard I plan  to use.

Sandwiching lead shot inside the centerboard without mixing it with glue proved very ill-advised. The shot was small, and the gluing of the plywood layers was not tight enough, so the shot was swishing around inside.  I was force to prize the layers apart, not an easy thing given how strong epoxy is. Then I mixed the lead with latex caulk and reglued the CB. The result was an imperfect lamination that made the CB too thick to fit in the CB trunk without getting stuck. The next inevitable step was to use an electric planer to remove a couple of millimeters from one side of the CB. Not something I would recommend except in extremis. In any case, it was done with a lot of flying shavings and some gouging, but after sanding, a little puttying and more sanding the CB was ready for more work.

The work in question was fitting a block to a corner of the CB for raising and lowering it. It involved cutting a semi-circular piece off the top forward corner and chiseling channels for the two stainless steel straps that are bolted to the CB on one end and the sheave at the free end (photo). Both bolts had to be cut very short to fit inside the 24 mm-wide CB trunk. Another sheave is fitted on the corresponding corner of the CB trunk for the lifting/dropping line. Because of the extra 4.5 kg of ballast and its leverage, the fittings needed to be sturdy. The 2:1 purchase from the blocks helps. The CB was coated with epoxy but no paint or varnish, since it will be invisible and protected from UV rays. Fitting the CB into its trunk and putting in the pivot bolt were tough: imagine being on your back with a lead-weighted CB on your chest, under a boat on bricks that could come tumbling down on you, trying to thread a quarter-inch bolt through three holes that need to be precisely aligned. My wife watched over me just in case. I'm happy to say that the CB and its raising and dropping bock and tackle system were fitted well and work fine (third photo).

Before I finished assembling the CB block system, I made the spars. The mast I made from a 4 m long (13' 1") piece of fir, 75 mm (3 inches) square. As in previous times, I cut the corners off at 45 degrees (this time with a hand-operated rotary saw since I don't have a table saw) to make an octagon. I went surprisingly well. Then I used an electric planer and a palm sander to make the mast round. The sprit I made by laminating two 4 m long boards. I had to extend it to 4.3 m, which I did by gluing a lumber extension between two plywood jaws. The latter form a shallow slot for the snotter, the improbably named line that holds the sprit up and adjusts its tension. Planing and sanding turned the sprit approximately round too. Both spars are visible in the next photo.

Sunday, November 17, 2013

More gaff and mast work

Carpentry on the new rig is progressing well.  The gaff jaws (first photo) were put together from two oak boards and four layers of 3/8 inch (9 mm) plywood with epoxy and stainless steel deck screws.  The holes for the parrel line will be drilled later, after fitting the gaff to the mast.

Then I worked on the mast step and partner.  I drilled two horizontal 1/4 inch (6 mm) bolt holes through the partner and bulkhead, and two vertical holes for the bolts that will keep in place the oak board securing the mast in the partner (second photo).  While I was drilling the port side bolt hole the wood cracked.  To deal with the crack and to avoid any more problems I removed 1/4 inch thick pieces from the bottom of the partner and glued plywood there: you can see the plywood layer if you look carefully.


I then put the mast step down on the keel batten with bronze nails, epoxy and stainless steel screws, and secured the partner to the main bulkhead with epoxy and two long lag bolts, with washers and nuts on the other side of the bulkhead.  Then came the time to try out the mast in its place.  As it turns out I had not accounted for the rake of the mast ahead of time (it was hard to do anyway), so the mast could not go all the way in and the oak board going across could not close.  I worked on the partner with the wood rasp, testing the fit several times.  Like all hand work it took a while, but now the mast fits in its partner and step.  Stepping it several times proved to me that it is easily doable by one person.

The last photo shows the new mast and bowsprit.  They still need some hardware and finishing, but I was pleasantly surprised at how straight a mast made from a couple of 2x4s turned out to be.  It is a little awkward and definitely heavier than the previous ones (as it needs to be) but at least it does not need to be vertically dropped through a partner hole, something that would probably hurt my back at my age.  I can shoulder it and walk it into place pretty easily.

I have already cut and shaped the wooden pad eyes for shrouds, and will be working on sails and standing rigging soon.

Until the next post,
boatbuilder

Saturday, November 2, 2013

Mast, step, partner, gaff



I bought SPF (spruce/pine/fir) 16-foot studs for their easy availability and low weight, which is a higher priority than high strength and stiffness, since the mast is stayed.  Low cost is a nice extra.  I chose two that were as straight and knot-free as possible.  Taking them home was a bit of an adventure, involving foam rubber, duct tape, cinch straps, staples and a red rag, but all went well.  Next I glued them together with epoxy.

Next in line was cutting and laminating the bowsprit as described in the previous post (first photo).  I test-fitted the slot over the bow extension.  Then I cut and laminated the bowsprit brace out of a piece of 2x4 and ¼-inch plywood.  There is a 1½ x 2¼ inch rectangular hole on its bottom center, and the bottom is curved to fit the foredeck.  A 1¾ x ¾ inch piece was removed from the rear top of the bowsprit to fit the hole.
 
I also cut and laminated the parts of the mast partner, which may be sturdier than it needs to be but I wanted plenty of strength for bolting to the bulkhead.  The mast step was laminated from a layer of cedar board and two of 3/8 inch plywood (second photo).

Then I set up the table saw outdoors (I needed 34 feet of space for the job, plus who wants to clean sawdust indoors), with my sturdy sawhorses doctored to have supports level with the table saw.  With a friend’s help I trimmed two sides to achieve a 3-inch-square cross-section, then cut off the four corners into an octagon.  All standard procedure I have used before.

The following weekend I hand-planed, tapered and sanded the mast into a smooth cylinder.  As before, I was not intent on perfect roundness or smoothness: this is a home-made mast and a slight hand-hewn look is fine by me.  Here is the new mast along with the old cracked one (third photo).  Exaggerated perspective notwithstanding, you can see how much sturdier the new one is.

The next step was to saw away a 3/8 inch layer from each side of the tip of the gaff (former mainmast) and cut oak pieces that will be glued there to make the jaws just over 3 inches apart.  The four layers of the jaws proper were cut out of 3/8 inch plywood.  The gaff tip was then rounded so it can pivot around the mast with ease.  The various parts are shown in the last photo.



Next steps, hopefully to be completed before the real cold sets in, will be:

  1. Laminate the jaw layers in pairs and screw and glue the entire jaw assembly to the gaff.  The holes for the parrel line will be drilled after careful fitting.
  2. Try out the mast in its step and partner.
  3. Bolt and glue step, partner and bowsprit brace.
  4. Glue and screw oak pad eyes near the mast top.
  5. Finish all with epoxy and varnish.

Then it will be time for the standing rigging, making the sails and fitting the running rigging hardware and lines, if all goes well in plenty of time before the spring.

Saturday, August 31, 2013

More adventures



Back in June we had a nice sail around Maumee Bay, and coming back we had to beat into the wind.  Unfortunately the knots in the loop of line securing the sheet block to the main sprit boom came undone and we were left with an out-of-control mainsail, just as the wind was becoming brisk if not fierce.  Not to be deterred, I left my friend Michael at the helm and grabbed the end of the boom with my hand.  Every time he tacked (and it was several times) I changed hands and sides and held on for dear life as the boat bucked the waves.  The virtues of two masts with smallish sails and the gentle behavior of the rig were apparent.  We made it to the ramp with no trouble.  Until, that is, I tried to bring the trailer around for retrieval.  I looked left and right, started moving out of the parking spot, looked behind to check the trailer, and then bang!  I had a low-speed collision with an SUV that was not supposed to be there.  He had snuck around from the wrong side of the parking lot behind two parked trucks, zoomed along and ended in the wrong place at the wrong time.  Anyway, a waste of time and money and a nuisance but no harm done.

Going out was fine, like the last time.  With a fair wind it took us no time to sail out to Maumee Bay State Park, where we beached the boat and had a quick swim.  I say quick, because the algae bloom was pretty bad so it was neither pleasant to look at nor particularly safe.  On the way back the same thing happened: we had to beat into an ever-stiffening wind and whitecaps.  As the wind got very strong, I was keeping a wary eye on the mainmast that was bending quite a lot.  I said to Michael, “you know, it would be really bad if the mainmast failed.”  As soon as I said it he pointed out that the mast was starting to delaminate at one point above the foredeck.  I did not bother to check it myself: I gave the helm back to him and dropped the mainsail, hoping to get in just by the mizzen, or by rowing if that didn’t work out.

Now I know what happens to a cat ketch with no mainsail.  It would not tack so we had to wear (turn through a gibe).  A sprit boom is much gentler than a regular one in a gibe, but still.  One time the boom tip knocked Michael’s hat off his head and he steered us back so I could retrieve it with the boathook:  a flawless maneuver that gives me some confidence that we can deal with a man overboard situation.  But every time we wore and gibed we lost whatever way we had made and were not moving.  So I decided to drop the mizzen sail, unstep the mizzen mast and row in.  In my haste I let the yard down too quickly and it hit me on the forehead, causing a scratch that bled quite a bit (for a short time fortunately).  We then rowed in the teeth of the waves and wind for over an hour.  It was incredibly hard work we but made it back for a well-deserved picnic.

So now what?  In designing the masts, I had not taken into account the fact that a lugsail is attached to the mast in only one place, at the very top where the yard is secured with halyard and toggle.  Hence the very noticeable bend.  The bending stress clearly found the weakest spot, a scarf joint on an outer layer of the three laminated together.  Interestingly there is much less bend and no problems so far with the mizzen mast.

I first considered two options: making new aluminum masts, or wrapping the existing masts in two layers of fiberglass tape.  Both are costly and would require a lot of work.  Fiberglass would also increase the weight, and for aluminum masts I would need to learn new skills and get new equipment (a pop riveter, say, as well as new hardware).  I therefore settled on a partial approach: only reinforce the places where there are outer scarf joints (two per mast) with fiberglass tape.  Bending per se is not a problem: it actually helps by flattening the sail and spilling wind in when it blows hard.  So I will try again and play it by ear.  If this is not enough then there are plenty of other options.  Aluminum masts won’t look as nice but are stronger per pound of weight.  And much as I hate to give up my one-of-a-kind rig and beautiful hand-made spars and sails, the boat can always be re-rigged.  A gaff sloop would be a good candidate.

Another thing I decided after all these adventures is that having an auxiliary engine is a good idea.  I will therefore accept a colleague’s offer of a very old, light and low-horsepower outboard.
But I hear you say, what about the leak, is it vanquished?  Alas, not quite.  Every time I tinker it gets smaller (down to about 1.5 liters/quarts after more than five hours) but hasn’t gone away yet.  I think there is a tiny void at the aft end of the centerboard slot.  I hope this is the end of it.

Until the next report.
boatbuilder

Saturday, March 17, 2012

Masts planed and fitted



This weekend I planed the masts to a round shape and tapered their ends.  As expected there was a huge amount of shavings.  The masts will need sanding, then two coats of epoxy and at least two of spar varnish.  But before that I had to try to step them to check everything fits.  It took a little extra planing but they both fit well.  I couldn't resist taking photos.  I can now imagine the boat completely rigged, flying in the breeze!

I had said I was hoping to launch the boat on the first warm, sunny day of the season.  Given the crazy weather we've been having, we've already had many warm, sunny days (it is 84 degrees Fahrenheit, or 29 Celsius, as I type, in March, in Northwest Ohio!).  But I still hope to lauch the boat by late April or early May, no more than a couple of weeks past the first anniversary of the first cut.  Wish me luck!

boatbuilder

Sunday, March 11, 2012

More mast and sail work

Two weekends ago I sanded the oars down to a ready-to-epoxy stage.  Then I finished the scarfing of the mast boards (or so I thought) by doing a lot of sanding.  Then I test-fitted the boards together.  Amazingly, they fit to the right length (except for an extra inch of length on one layer), but some of the scarf joint surfaces needed to be sanded further for a better fit.  I did some of the gluing at one end of each mast (first photo, left side).  I also ordered as much chandlery as I could think of from Annapolis Performance Sailing and Jamestown Distributors.

Last weekend I re-sanded the remaining scarf surfaces, then I finished gluing up the main mast blank (first photo, right side).  While the epoxy was curing, I bought the lumber for the boat's floor (mainly cedar 1X4 boards), and filled the recessed nail holes in the boat's top and insides with putty.  The next day I glued up the mizzen mast.

This week I finished the sails by putting in battens (photo) and reef points.  Finally, I started on the shaping of the masts.  This involved first trimming the laminated piece from 2½ X 2¼ inches to 2¼ square, then cutting the corners off at a 45-degree angle for an octagonal cross-section (last photo).  The rest will be achieved by rounding the eight corners with drawknife and hand plane, then sanding.  There will be tapering from mast partner to mast step, plus a little at the top.  I will have to do all this to both masts before they can be epoxied and varnished. 

The next steps will be:
  1. Cut a hole for an inspection port next to the main mast hole, for access to the space between bow and first bulkhead.   This compartment may have some water leaking into it through the edges of the mast hole.  Rather than build an elaborate mast tube with drainage system, I will simply dry the compartment as needed.  It may also provide useful storage.
  2. Sand the benches and the decking.
  3. Fillet all the joints along the bottom (seat risers and  bulkheads with bottom, and seat risers with frames).  This will improve strength and the water-tightness of compartments.
  4. Build the ballast box.
  5. Put in oarlock sockets and carve the boat's name on the rubrails (in English and Greek).
  6. Lay two coats of epoxy on insides and decks. 
  7. Fill the ballast box with lead shot.
  8. Put in the floor and epoxy the planks.
  9. Finish everything with paint or varnish.
  10. Set up the rigging.
Wow, that's still a lot of work.  In case you are wondering why I often list my next steps, it's mainly for my own benefit: I need to work out the sequence because I designed the boat and the rigging and everything else and I am figuring out stuff as I go along.

So keep checking 176inches as the saga continues.

boatbuilder

Sunday, February 19, 2012

More planing and scarfing

The past two weeks I have been working on the oars and I started on the masts.  Last week I cut new oar blade pieces and glued together new oar blades.  I used filleting compound (epoxy and wood flour) to glue and reinforce the joints, and put the pieces over a heat register to make sure the epoxy cured properly (first photo).  Once that was done, I did a lot of planing to taper the oar blades to the right profile and rounded their corners (second photo).  The oars were a little heavy, so I decided to round the shafts all the way from where they meet the oarlocks (where the so-called button will go) to the blade.  I did it with drawknife and plane, using only my eyes and sense of touch for guides, and created an unbelievable amount of wood shavings (my wife said, "too bad we don't have a hamster").   By now the rough carving of the oars is done and they will need much sanding before they are epoxied and varnished.  Hours of physical labor went into it but there is something very satisfying about this type of woodwork.


Today I started on cutting the boards for the masts and creating the scarf joints.  I thought I would try to cut the joints rather than spend hours sanding the joints away.  First I clamped together six boards, staggered by 4 inches each, and clamped on a piece of leftover poplar 1X2 as a cutting guide for the circular saw (third photo).  It worked, sort of: keeping the blade absolutely vertical is not easy.  So now I have to finish the job by sanding the scarfs flat (last photo), but at least 80% of the material is already removed.

Then I cut two of the remaining boards in two, using the same kind of diagonal scarf cut.  I got two pieces of approximately 48 inches and two of just over 43.  I got three pieces of 24 inches out of the ninth board, and a 19 inch piece from a bit left over from the my original, abortive oar blade work.  Once again the scarf joints were not cut 100% right and they need sanding to the final shape.  After that, the boards will be arranged in the following way:

Main mast: top layer eight feet plus four feet; middle layer two feet plus eight feet plus two feet; bottom layer four feet plus eight feet.  This will create a mast of about 12 feet, with scarf joints at different places to avoid weak points.

Mizzen mast:  top layer eight feet plus 43 inches; middle layer two feet plus eight feet plus 19 inches; bottom layer 43 inches plus eight feet.  This will create a mast of about 139 inches.

There will be more sawdust flying, clamps tightening and epoxy curing, so keep checking 179inches.

boatbuilder

Tuesday, February 7, 2012

Yards, oars and masts

The sails are now done.  I still need to sew reef points, which involves sewing on square pieces of sailmaker's tape with a buttonhole at the center of each (some people prefer grommets, but I'm good with the machine buttonhole stitch) .  Reefing, for landlubbers, means shortening the sail and rolling up and securing the loose ends by tying loops of line that go through each reef point buttonhole.  Since the leech of the sail is rounded for maximum sail area (this is called roach, again no idea why) I need to use battens to stiffen it, which means sewing in batten pockets made of folded-over sailmaker's tape.  Both these will wait until I order all the chandlery (blocks, cleats, fairleads, rope, anchor, assorted hardware and battens).

Meanwhile I have rounded and sanded the two yards, and have put on one coat of epoxy.  After drilling holes at the ends to tie the corners of the sail's head onto the yard, there will be sanding, a second coat of epoxy, more sanding and a couple of coats of spar varnish.  That will take time, so I started on making the oar shafts, by laminating together two layers of 1X2 poplar, 1 1/2 inch-square (or 37 mm square) in total actual dimensions.  Then I cut and edge-glued the rough oar blades from 1X2 poplar (center) and 1X3 pine (sides).  You can see them in the photo.

While I was tapering the shafts down to the blade's thickness of 3/4 inch (19 mm) with a hand plane, both blades managed to fall to the floor and delaminate into two pieces each.  Better now than later, I think.  Clearly the temperatures, even in the partially heated basement, are too low for reliable epoxy curing.  I think I will take the opportunity to redo the blades.  I originally decided to use pine on the sides for the visual contrast, but pine is probably too soft for an oar blade that could be scraping against sand and stones.  I also realized that the original blades are a little stubby.  So I will make the new ones longer, and will cut them from poplar like the rest of the oar.  I don't mind: remarkably, this is pretty much the first thing I've had to do over in this whole project.  I will have to glue the blades and shafts together with thickened epoxy, and make sure I keep the basement and/or the piece warmer.  Then the blades will have to be tapered to a thinner edge, the corners rounded, etc.  In the meantime I have started rounding the shafts at the hand-grip ends.  Next I will round the shafts where they meet the oar locks, and that part will need leathering and buttons put on--I'll explain later.  All in all there will be even more planing, shaving, sanding and other work before the oars are ready for coating.

In between all this I will also be cutting 14 mast boards and preparing a total of 16 wedge-shaped board ends for eight staggered scarf joints.  Check 176inches for more details and pictures of mast work.

boatbuilder